CCR Unit 2 & 3

Industrial power plant with cooling tower, transmission tower, and power lines by a body of water under a clear blue sky.

Welcome to the CCR Units 2 & 3 compliance data page for Western Farmers Electric Cooperative.

This section provides comprehensive information on the closure and post-closure care for CCR Units 2 & 3. It includes closure plans, post-closure care documents, design criteria, and other critical reports ensuring our compliance with CCR regulations. You will also find construction history and safety assessments related to these units.

Closure and Post Closure

2016 CCR Surface Impoundment Closure Plan
2016 CCR Surface Impoundment Post-Closure Plan
2018 Revised Closure Plan (Coverletter)
2019 11 21 85009 CCR Impoundment Closure (Rev 4)
2020 07 15 WFEC Unit 2 Impoundment Closure Certification
2020 08 18 DEQ Certification of Closure WFEC CCR 2
2020 Notice of Closure to Deq
2021 03 16 Notice of Closure for CCR3
2023 04 06 WFEC Unit 3 Impoundment Closure Memorandum Final Sealed
2023 08 22 DEQ Final Closure of CCR3 SW Permit 3512008-SI

 Design Criteria

Hazard Potential Classification

Download

Safety Factor Assessment

Download

LINER Type Documentation

Download

Location Restrictions

2018 Seismic Report
2018 Wetland Report
2018 Uppermost Aquifer Report
2018 Fault Report

Operating Criteria

2016 Inflow Design Flood Control Plans
2020 Permit 3512008 SI Surface Impoundment
2020 08 18 Permit 3512008-Si Solid Waste Permit Modification
2023 08 22 DEQ Final Closure of CCR3 SW Permit 3512008-SI

Corrective Measures

Note: No corrective measures have been required.